TRANSPORT FROM THE SHIP TO THE TRANSFORMER BASIS 224 TONS
Transformer loading in the port of Gdańsk by floating
crane MAJA from the vessel onto railway carriage
Transformer after trans-shipment at the railway carriage
Trans-shipment from railway carriage onto trailer by the
application of hydraulic remote cylinders and sliding
beams
Oversized set with ABB-transformer loaded onto heavy modular
trailer – ready for trip
The transformer on the target place – Highest Voltage
Switching Station
The transformer positioning after uploading by sliding
method